NZ Roof Tools Takeoff

Guide

Choosing a secret-fix tray for a NZ roof

Secret-fix (tray / trough) is a different family from pierce-fixed corrugate and trapezoidal. Clips sit under the rib. There are still fasteners — they are not through every weathering face. Do not specify clips or seams from a photo. Pitch questions: secret-fix tray minimum pitch.

Cover is the order width

This library’s tray is 300 mm cover / 325 mm overall / 3° / check after 60 m, CoP secret-fix ~30 mm. Real pans are often 265–500 mm. Heritage Tray (Dimond example) is about 450 / 465 mm / 3°.

9.2 m ÷ 0.450 m = 20.44 → 21 sheets. Using 465 mm overall → 20 and a shortage. Override cover on the secret-fix calculator when you know the pan. Worked millimetre check: tray cover width.

When not to lock tray

Then stop and get the manufacturer or an LBP. The calculator will still run the CoP 3°/60 m row if you leave the placeholder — that is a warning aid, not an approval.

Takeoff sequence

  1. Write manufacturer, pan name, cover, clip type, max length.
  2. Split planes (multi-section).
  3. Count from cover; length from slope including eaves.
  4. Tray flashings (grab / verge / ridge / wall), not generic barge from corrugate (flashing checklist).
  5. Extra High still changes junction cover.

NZMRM CoP profile classification and the named PTS remain the authority.