New Zealand · metal roofing
Will this longrun roof work, and what do I order?
A CoP-aware takeoff for NZ metal roofs.
Enter plan length, width, overhangs and a real NZ profile once you already know the pitch. You get sloped area, sheet count from cover width (not overall sheet width), sheet lengths, ridge, barge, hip and valley allowances, waste that changes with hips and valleys, plus minimum cladding pitch, CoP run-length checks and Extra High flashing cover.
The same engine runs on every tool page. A garage corrugate job and a low-pitch trapezoidal house use the same numbers. Add a second section when the garage or porch is a different pitch; NZ houses are often built that way.
Screenshot the result and send it to a merchant. Confirm it against the NZMRM Code of Practice, the manufacturer sheet, and a Licensed Building Practitioner before you order.
FAQ
Is this a quote?
No. It is a material takeoff with CoP warnings. Labour, scaffold, removal, penetrations and access are out of scope unless you type your own rates into the optional pricebook.
Why not just use a pitch calculator?
Pitch in degrees is a 30-second calculation. The expensive mistakes are ordering corrugate at 6°, using overall sheet width instead of cover, applying a flat 10% waste to a hip roof, and missing Extra High barge cover.