NZ Roof Tools Takeoff

New Zealand · metal roofing

Roof area calculator

Sloped area is plan area including overhangs, divided by cos(pitch). That is the whole formula. The rest is not forgetting the eaves.

Standard 16.5 mm corrugate. CoP min cladding pitch 8°. Check drainage after 15 m of run.

Supplier pricebook (optional)

Your rates, GST exclusive. Totals add 15% GST. Hip flashing uses the ridge rate.

A 12 m × 8 m gable at 15° is not 96 m² of roof. Add 450 mm eaves on both long sides and 50 mm verges, then divide by cos(15°). The metal has to cover the overhangs; the underlay usually does too. This calculator shows plan area and sloped area side by side so you can see the pitch factor instead of hiding it in a “12% extra” fudge.

Hip roofs at a single pitch have the same area relationship — plan rectangle including eaves, times 1/cos(pitch). What changes is cutting pattern and flashing length, which is why waste is higher even when area looks tidy.

Multi-section NZ houses (house + garage + porch) should be entered as separate planes. Adding footprints and applying one pitch is how people miss a 5° lean-to.

FAQ

Is roof area the same as squares?

A US roofing square is 100 square feet. NZ merchants work in m² and lineal metres of sheet. This tool stays metric.

Does roof style change area?

Not for a simple rectangle at one pitch. Gable vs hip changes flashings, waste and sheet cuts, not the raw sloped area of that rectangle.