NZ Roof Tools Takeoff

New Zealand · metal roofing

Roof area calculator

Sloped area is plan area including overhangs, divided by cos(pitch). The rest is remembering the eaves.

Standard 16.5 mm corrugate. CoP min cladding pitch 8°. Check drainage after 15 m of run.

Supplier pricebook (optional)

Your rates, GST exclusive. Totals add 15% GST. Hip flashing uses the ridge rate.

A 12 m × 8 m gable at 15° is not 96 m² of roof. Add 450 mm eaves on both long sides and 50 mm verges, then divide by cos(15°). The metal has to cover the overhangs; the underlay usually does too. This calculator shows plan area and sloped area side by side so you can see the pitch factor instead of hiding it in a “12% extra” fudge.

Hip roofs at a single pitch use the same relationship: plan rectangle including eaves, times 1/cos(pitch). What changes is cutting pattern and flashing length, which is why waste is higher even when area looks tidy.

Multi-section NZ houses (house + garage + porch) should be entered as separate planes. Adding footprints and applying one pitch is how people miss a 5° lean-to.

FAQ

Is roof area the same as squares?

A US roofing square is 100 square feet. NZ merchants work in m² and lineal metres of sheet. This tool stays metric.

Does roof style change area?

Not for a simple rectangle at one pitch. Gable vs hip changes flashings, waste and sheet cuts, not the raw sloped area of that rectangle.